Saturday, July 12, 2008
Gazebo- final stages
A long day for the guys today and much done.
Trenches to bury the electrical wires to both sleeping cabin and gazebo, electrical wiring in the gazebo, completing the ledges on the knee wall in the gazebo, the door trim and the cedar siding on the gazebo.
The gazebo look terrific! Yesterday some folks going by in a motor boat slowed down to check out the gazebo and today 4 people on on seadoo were buzzing by, spotted the gazebo, slowed down and then turned around and actually stopped to have a good look. Obviously, it is going to get some curious folks checking it out, and wait until we get the lights in there reflecting off the under side of the roof!
Not a lot left to do on the gazebo - some can't bve done until we get the door, which hopefully will be Monday or Tuesday.
In the late afternoon I went out in the kayak to have a look at it from the water. Looks equally great, so I went for my camera and took few pictures from out off the point - they are first in the group of photos here.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment