Wednesday, July 30, 2008

Cabin and gazebo - final stages




Two long work days for the guys - not a lot of flashy stuff but a lot of finishing things accomplished. Siding on sleeping cabin completed, new steel door in sleeping cabin, more windows installed, inside door between sleeping cabin room and sun porch in place, walkway and railing completed, electricity to gazebo, screen door and lights installed - I'm sure I have missed something.
Rich and Ron are on their own, Andy was unable to come so in order to get the essentials done they are working long hours.
The gazebo is essentially complete - it is amazing at night with the lights casting a golden glow - and mosquito free! We had drinks there after dark and it was great.
Tomorrow if all goes well we should have electricity in the sleeping cabin, motion lights up, and the flooring in place.
The photos, in reverse order, are the gazebo with screen door in place, the north side of the sleeping cabin with siding completed, outside steel door in place and completed walkway and railing and the gazebo at dusk with the lights one (doesn't do justice to the real appearance).

No comments:

Post a Comment